Project Description

CASE STUDY

Natural smoke ventilation controls as part of a large scale fire protection system upgrade

Project

Dyer Environmental Controls provided a natural smoke ventilation system as part of a system upgrade at Ledgard Bridge Mill apartment block.

System

Dyer supplied and installed a number of control panels to operate pre-existing vents within the building. The new systems operate various smoke vents including ground floor glazed louvres, high level atrium vents, smoke shaft inlets, head of shaft dampers, head of stair vents and end of corridor windows. Dyer also supplied and installed the EN certified F100 dome vent as part of the upgraded systems.

Once smoke has been detected in the common area the local AOV will trigger open, drawing the smoke out of the building. The system can then be reset from the local call point unit. The vents will automatically close once the fire floor has been reset.

Natural ventilation switches have been installed on the upper floor to allow the residents operation of the vents if required. Rain sensors will automatically close the vents if rain is detected.

RELATED CASE STUDIES

LATEST TWEETS…

@dyerenvironment

- 23 hours ago

From the start of a project right through to completion, post-installation and maintenance, Dyer are here to help. Find the right departments to talk to on our site - https://t.co/pbNAQ6Da5c https://t.co/o6IsIiAsi0
h J R
@dyerenvironment

- 3 days ago

Dyer supplied & installed our D+H KA drives to Schüco windows (supplied & installed by @TheAlumetGroup), to provide certified NSHEVs at River Street Tower student accommodation in Manchester. Information on NSHEVs - https://t.co/titxuSO1Cm & KA drives - https://t.co/MieaZW5kki https://t.co/KpLUlUZkmI
h J R
@dyerenvironment

- 8 days ago

Dyer’s mechanical smoke ventilation systems control fire rated fans, dampers, grills and vents in order to manipulate smoke and poisonous gasses up and out from common areas such as corridors and lobbies. See our site for more information - https://t.co/F7gRFKxwsf https://t.co/UXOpUTI0q2
h J R
@dyerenvironment

- 10 days ago

Dyer recently installed end of corridor and head of stair AOVs as part of a natural smoke ventilation system at the refurbished grade II listed former Cookridge Hospital in Leeds. Details on our products and systems can be found on our site - https://t.co/z7KoN9qNJd https://t.co/Ww3q7kRD7o
h J R
@dyerenvironment

- 15 days ago

Dyer’s smoke ventilation maintenance packages can be customised and adapted to suit all budgets and requirements. Contact our team on 0161 491 4840 (option 5), or [email protected] More information is available on our site - https://t.co/vWdBo4dB4a https://t.co/ntd4gmCR0l
h J R