Project Description

CASE STUDY

Smart automated louvres for natural and smoke ventilation

Project

Dyer Environmental Controls Ltd provided a natural smoke ventilation system consisting of a CPS-M control panel and louvres complete with drives at Sixty London Wall.

Sixty London Wall is a mixed-use building in the heart of London. It offers 325,000 sq. ft of office space over ten floors and 20,000 sq. ft of retail space on the ground floor.

System

Dyer supplied and installed 6 aluminium louvres plus their controls as part of a natural smoke ventilation system.

The certified louvres are located at the top of the building, each one has two D+H LDF drives for operation. The CPS-M panel controls the drives and is linked directly into the Building Management System (BMS).

Dyer used the D+H BSY gateway module within the panel. This enabled us to connect a 0-10 BMS signal, allowing for modulated opening of the drives for natural ventilation purposes. This smart technology allows for simple and easy operation, and is possible with any BSY enabled D+H drive.

In the event of a fire, the CPS-M panel will receive a signal from the fire alarm. This will activate the louvres to open, drawing the smoke up and out of the affected space.

RELATED CASE STUDIES

LATEST TWEETS…

@dyerenvironment

- 22 hours ago

Our EN 12101-2 certified smoke ventilation rooflight is ideal for head of stairs and is available in multiple sizes. See our site for performance features and technical data - https://t.co/7tZUGCvvrE https://t.co/viSBru78dl
h J R
@dyerenvironment

- 10 days ago

The EN 12101- 2 certified roof louvre vent is a low profile aluminium louvre, specifically designed for both smoke and natural ventilation applications. See our site for performance features and technical data - https://t.co/tHVVa1QxT3 https://t.co/oI3os32BbE
h J R
@dyerenvironment

- 13 days ago

Our aluminium-framed louvres are tested in accordance with EN 12101-2 to provide natural & smoke ventilation. They are ideal for end of corridor requirements, particularly within high-rise buildings. See our site for more information - https://t.co/UMzCDOwfDF https://t.co/T90AexhVvZ
h J R
@dyerenvironment

- 19 days ago

@ColeWaterhouse: The making of No.1 Old Trafford. Cole Waterhouse captured the entire build process on-site at the iconic address. From the Groundbreaking Ceremony to Project Completion two months ahead of schedule, you can now see the delivery of this two-year project in just 48 seconds. https://t.co/fN8vDE1BvU
h J R
@dyerenvironment

- 20 days ago

The EN 12101-2 certified F100 dome vent is ideal for staircase and corridor smoke extraction when installed on flat and pitched roofs. See our site for performance features and technical data - https://t.co/E0x7JIU4Ef https://t.co/fxSin6VH5w
h J R